| July 2001
July 2002
| Chicago Tribune
Chicago, IL
Technical Manager for the Chicago Tribune Collator Cell Control
System at the new Sunday Packaging Facility. This project involved the
integration of three new collating machines and associated downstream
equipment by Prim Hall.
Sunday circulation estimated at 1,016,000
Directed the R&D efforts of the engineering team at
Prim Hall's manufacturing facility in Plattsburgh, NY. Spent over two
months collecting test data and revising the software development
plan. Created stretch goals and provided motivation to the engineering
team to perform. Directed the installation and startup of the Collator
Cell Control System at Chicago Tribune's Sunday Packaging Facility
(onsite for 8 months). Prepared schedules and project status reports.
Regularly attended meetings with the directors at the Tribune to
formulate project execution strategies for the engineering team.
Relieved engineer's involvement with management tasks in an effort to
focus their attention on the engineering tasks at hand.
|
| September 2001 January 2002
| Arizona Republic
Phoenix, AZ
Project Manager for the Arizona Republic Mailroom Automation
Project. This project included the system integration of six
Heidelberg NP2299 inserters with dual delivery.
Daily circulation estimated at 496k
Sunday circulation estimated at 602k
Prepared schedules and project status reports. Handled internal
cost of completion estimates and external project reviews with the
customer. Completed onsite progress review and assisted with the
installation and startup of Inserter A at the Mesa Production Facility.
|
| September 2001 January 2002
| Orlando Sentinel
Orlando, FL
Project Manager for the Orlando Sentinel Mailroom Automation
Project. This project included the system integration of two
Heidelberg NP2299 inserters with dual delivery, two Heidelberg NP1472
inserters, and one Heidelberg NP630 inserter.
Daily circulation estimated at 265k
Sunday circulation estimated at 388k
Prepared schedules and project status reports. Held
meetings with the Orlando Sentinel management team. Developed project
execution strategies and estimated completion dates. Completed onsite
evaluation studies and assisted with the integration of downstream
equipment on Inserter 1 at the Orlando Sentinel Production Facility.
|
| September 2001 January 2002
| Omaha World-Herald
Omaha, NE
Project Manager for the Omaha World Herald at the new Freedom
Center Packaging Facility. This project involved the integration of
three new Heidelberg NP632 inserting machines and associated downstream
equipment.
Daily circulation estimated at 222k
Sunday circulation estimated at 268k
Prepared schedules and project status reports. Held meetings with
the Omaha World Herald management team. Developed project execution
strategies and estimated completion dates. Completed onsite evaluation
studies and assisted with the integration of several inserters at the
Freedom Center Packaging Facility.
|
| September 2001 January 2002
| Dallas Morning News
Plano, TX
Project Manager for the Dallas Morning News Mailroom Automation
Project. This project involved the integration of five Heidelberg
NP1472 inserters with dual delivery and five GMA SLS1000 inserters.
Daily circulation estimated at 526k
Sunday circulation estimated at 777k
Introduced to the Publishing Industry. Gained domain
knowledge through interaction with the engineering team. Developed
project schedules and status reports. Completed onsite tour of the
mailroom and became familiar with the equipment associated with
packaging a bundle for distribution.
|
| August 2001
January 2002
| Inland Rome
Rome, GA
Project Manager for the Inland Rome Powerhouse Automation Project.
This project involved the implementation of supervisory control
strategies for five boilers on a Bailey Infi-90 DCS platform.
Prepared schedules and project status reports. Held meetings with
the Inland Rome process control team. Developed project execution
strategies and estimated completion dates. Supervised the development
of module configuration and the graphical user interface.
|
| November 2000
October 2001
| The Pentagon
Headquarters of the United States Department of Defense
Washington D.C.
Project Manager for the Pentagon Utilities Study. This project
involved the design and development of a proposed control system with
associated control strategies for power boilers and air handling
units.
Prepared schedules and project status reports. Held meetings with
the Pentagon process control team. Coordinated the research of a
proposed Fisher Provox DeltaV DCS control system. Supervised the
development of proposed control strategies and onsite evaluation
studies by the design team.
|
| March 1999
November 2000
| Georgia-Pacific Corporation
Ashdown, AK
Lead Engineer for the new O2 Delignification Project. This project
involved the new implementation of new controls for the O2
Delignification Plant in the No. 2 Pulp Mill.
Developed the control strategies, graphical user interface, and
Bailey infi-90 DCS module configuration. Supervised the cabinet design
and field wiring implementation. Assisted with the instrumentation loop
checkout during startup.
|
| April 1998 March 1999
| Georgia-Pacific Corporation
Ashdown, AK
Lead Engineer for the 1A, 1B, and No. 2 Bleach Plants Elemental Chlorine Free
(ECF) Project. This project involved the elimination of chlorine as
mandated by the Environmental Protection Agency's guidelines for pulp
mills.
Developed the control strategies, graphical user interface, and
Bailey infi-90 DCS module configuration. Supervised the cabinet design
and field wiring implementation. Assisted with the instrumentation loop
checkout during startup.
|
| October 1997
April 1998
| Union Camp Corporation
Franklin, VA
Lead engineer for the Recovery Boiler Retrofit Project. This project
involved the controls retrofit of legacy pneumatic and electronic
controllers on three recovery boilers to a Bailey Infi-90 DCS control
system.
Developed the control strategies, graphical user
interface, and module configuration. Developed an interface to an
Allen-Bradley PLC-5. Supervised the development of a simulation
package for customer acceptance testing, verification of control strategies,
and operator training prior to startup. Supervised the cabinet design
and field wiring implementation. Assisted with the instrumentation loop
checkout during startup.
|
| July 1997
October 1997
| Georgia-Pacific Corporation
Ashdown, AK
Lead Engineer for the Pulp Dryer DCS Upgrade Project. This project
involved the controls retrofit of legacy pneumatic and electronic
controllers on a pulp drying machine to a Bailey Infi-90 DCS control
system.
Developed the control strategies, graphical user
interface, and module configuration. Developed an extensive simulation
package for customer acceptance testing, verification of control strategies,
and operator training prior to startup. Supervised the cabinet design
and field wiring implementation. Assisted with the instrumentation loop
checkout during startup.
|
| July 1995
July 1997
| Weyerhaeuser Paper Mill
Plymouth, NC
Technical Engineer for the Centralized Control Room
Project. This project involved the controls retrofit of an entire
power distribution plant within the pulp mill: Evaporators, Black Liquor Recovery
Boiler, and Riley Power Boiler. Developed the control
strategies, graphical user interface, and module configuration.
Developed an interface to an Allen- Bradley PLC-5. Supervised the
cabinet design and field wiring implementation. Developed an extensive
simulation package for customer acceptance testing, verification of
control strategies, and operator training prior to startup. Assisted
with the instrumentation loop checkout during startup. Trained pulp
mill operators on the new control strategies and interaction with the
Bailey Operator Control Interface.
|
| January 1993 July 1995
| Georgia-Pacific Corporation
Ashdown, AK
Technical Engineer for the Digesting Controls Upgrade
Project. This project involved the controls retrofit of the entire
Pulp Mill Area: No. 1 Batch Digesting and No. 2 Kaymr
Continuous Digesting Bleach Plants, O2 Delignification, Chillers, and the Chip
Handling conveyors. Assisted in the development of Bailey Infi-90 DCS module configuration and
graphical user interface, developed I/O listing, panel design, loop sheets,
wiring diagrams, instrument index, motor elementaries, and P&IDs.
Developed control strategies for all of the associated system
controls.
|
| May 1992 September 1992
| Mead Paper
Dayton, OH
Technical Engineer for the Power Recovery Controls Upgrade
Project. This project involved the controls retrofit of Falling Film Evaporators,
Recovery Boiler, and Power Boiler.
Assisted in the development of the Bailey Infi-90 DCS module configuration and
graphical user interface.
|
| October 1991
May 1992
| Mead Paper
Mahrt, AL
Technical Engineer for the Recycle Plant Controls Upgrade
Project. This project involved the implementation of new controls the
corrugated cardboard recycle plant.
Assisted in the development of the Bailey Infi-90 DCS module configuration,
Allen-Bradley PLC-3 interface and graphical user interface.
|
| September 1990
October 1991
| Mead Paper
Dayton, OH
Technical Engineer for the Power Recovery Controls Upgrade
Project. This project involved the controls retrofit of Power Boilers 7 & 8, Bark
Boiler No. 6, Power Monitoring, Water Distribution System and
Demineralization System.
Assisted in the development of the Bailey Infi-90 graphical user interface.
|
| March 1990
September 1990
| Mead Paper
Mahrt, AL
Technical Engineer for the Pulp Mill and Liquor Recovery
Design Study. This study involved the proposed design documentation of
the entire Pulp Mill, Powerhouse and Liquor Recovery Areas.
Performed field study,
developed I/O listing, panel design, loop sheets, wiring diagrams,
instrument index, motor elementaries, and Process &
Instrumentation Diagrams.
|
| May 1989
March 1990
| Kraft Paper
Macon, GA
Technical Engineer for the Pulp Mill Design Study. This study
involved the proposed design documentation of the entire Pulp Mill
Area.
Performed field study,
developed I/O listing, panel design, loop sheets, wiring diagrams,
instrument index, motor elementaries, and Process &
Instrumentation Diagrams.
|